
At about 18:30 on 21 August 2009, two spans on the 12-span viaduct at Malahide collapsed. The collapse of the structure was due to scouring of a pier by tidal action. The line was immediately closed to rail services and placed under an engineer’s possession. Following reconstruction works, possession was handed back at 18:00 on
The post The collapse and reconstruction of the Malahide Viaduct – part 1 appeared first on Engineers Journal.